After 20+ years of bidding municipal and HOA pavement work across the Northern Rockies and Dakotas, we can predict the outcome of a project from the RFP alone. Tight RFPs attract tight bids and produce great work. Loose RFPs attract loose bids and produce disputes.
This is the structure we recommend — and the language we wish more boards and public-works directors used — when scoping crack sealing, sealcoating, line striping, or full preservation programs.
What a strong pavement RFP includes
| Section | Why it matters | What to include |
|---|---|---|
| 1. Site inventory | Bidders can't price what they can't measure | Square footage by surface, lane-miles, drawings or aerial map |
| 2. Current condition | Forces apples-to-apples bids | PCI estimate, crack inventory, photos, oil-spot count |
| 3. Scope of work | The legal heart of the contract | Itemized tasks with units (LF, SF, EA) |
| 4. Material specification | Stops the race to the bottom | ASTM standards, EPA 8310 PAH cap, manufacturer spec sheets |
| 5. Submittals required | Filters serious bidders | COI, references, sample data sheets, lab reports |
| 6. Evaluation criteria | Tells bidders how to win | Price weight + technical weight + responsiveness |
| 7. Schedule & access | Prevents change-order fights | Working hours, lot-closure windows, weather contingencies |
| 8. Warranty & documentation | Defines "done" | Warranty term, post-job submittals, before/after photos |
1. Site inventory
Provide a measured square footage by surface type (drive lane, parking stall, ADA path, sidewalk). If you can attach an aerial PDF with quantities marked, you'll get bids 20% tighter on average.
2. Current condition
Don't make bidders guess. State the PCI range (or have a free assessment done — we offer them across our service area), itemize the cracks > 1/8", and call out oil spots that need primer. A 3-page condition report turns a $40,000 sealcoat job into a $40,000 ± $1,500 bid range instead of $30k–$65k.
3. Scope of work — itemized, not narrative
Bad scope: *"Contractor shall sealcoat the parking lot."*
Good scope:
- *Crack seal: 4,200 LF of cracks ≥ 1/8" with hot-applied rubberized sealant meeting ASTM D6690 Type II.*
- *Oil-spot primer: 47 EA, each treated with a manufacturer-approved oil-spot primer prior to sealer application.*
- *Sealcoat: 48,500 SF, two coats of asphalt-emulsion sealer applied at the manufacturer's published rate, with sand additive at 3 lbs/gal.*
- *Line striping: re-stripe to existing layout, 4" white traffic paint, 92 stalls and 4 ADA stalls, ADA symbols and signage per ADA compliance guide.*
4. Material specification — write it once, win every year
This is the single most under-used section in HOA and municipal RFPs. The standard language we recommend:
> *Sealer shall be an asphalt-emulsion (non-coal-tar) pavement sealer meeting ASTM D-217 (cone penetration ≥ 340mm), D-2042 (10–35% asphalt residue), D-244 (15–20% water), D-3910 (wet track abrasion ≤ 35g loss), C-136 (#16 sieve 100% passing), and D-562 (≥ 75 KU viscosity). Total PAH shall be ≤ 1 ppm per EPA Method 8310, documented on a batch-specific lab report.*
Pitch Black® meets every clause — see the Technical Bulletin and the coal-tar bans post for context on why the PAH cap is now standard.
5. Required submittals
Ask for these at bid time, not after award:
- Certificate of Insurance (general liability ≥ $2M, auto, workers' comp).
- Three references on similar-scope projects within the last 24 months.
- Manufacturer data sheets and EPA 8310 lab report for the proposed sealer.
- Sample warranty document.
- Crew credentials and equipment list.
Bidders that can't produce these in 5 business days will not produce them in 90.
6. Evaluation criteria — publish the weights
A defensible municipal evaluation is typically 60% price / 30% technical (experience, materials, references) / 10% schedule & responsiveness. HOAs can run a simpler 70/30. Publishing the weights gets you better technical bids — and a paper trail if you need to defend the award.
7. Schedule and site access
- Working hours (allow Sundays for retail).
- Allowable lot-closure days and notification requirements (signage, email blasts).
- Weather contingency language — application temperature requirements per the sealer manufacturer's spec.
- Substantial-completion vs. final-completion definitions.
8. Warranty and post-job documentation
Require these as submittals after the work:
- Time-stamped before/after photos of every area.
- Application logs (gallons applied, temperatures, dates).
- One-year workmanship warranty signed by the contractor.
- Final invoice with quantities verified.
See Summit's standard warranty page for a model.
The 1-page template summary
If you'd rather start from a 1-pager than draft this from scratch, email us at info@summit-surface.com and we'll send you the editable template we share with HOA boards and small-city public-works departments at no charge. It's not a sales document — it's the framework we wish every owner used, even on jobs we don't bid.
When in doubt, do a free site walk first
The cheapest 60 minutes you'll spend on the entire project is a pre-RFP site walk with someone who's actually paving in your region. We do them for free across MT, ID, WA, ND, and SD. Call (406) 309-SEAL or schedule a site walk.
Frequently Asked Questions
What should a good pavement-maintenance RFP include?
Eight sections: site inventory, current condition, itemized scope of work, material specification (ASTM + EPA 8310 — see the coal-tar bans post), required submittals, evaluation criteria with published weights, schedule and access, and warranty plus post-job documentation. Pair the scope with the right services — crack sealing, parking-lot sealcoating, and line striping.
How should bids be weighted on a municipal pavement RFP?
A defensible municipal evaluation is typically 60% price, 30% technical (experience, materials, references), and 10% schedule and responsiveness. HOAs can simplify to 70/30. See How to Vet a Commercial Sealcoating Contractor for the technical-scoring checklist.
What material spec language should I require for sealcoat?
*Sealer shall be an asphalt-emulsion (non-coal-tar) pavement sealer meeting ASTM D-217, D-2042, D-244, D-3910, C-136, and D-562 with documented total PAH ≤ 1 ppm per EPA Method 8310 on a recent production batch.* Pitch Black® meets every clause — and the wholesale program ships the lab report with every order.
What submittals should bidders provide at bid time?
Certificate of Insurance (general liability ≥ $2M, auto, workers' comp), three references on similar-scope projects within 24 months, manufacturer data sheets, an EPA 8310 lab report, a sample warranty document, and crew credentials with equipment list. Bidders who can't produce these in 5 business days won't produce them in 90.
Does Summit Surface Partners share its RFP template?
Yes — email us at info@summit-surface.com and we'll send the editable 1-page template we share with HOA boards and small-city public-works departments at no charge. We bid across our five-state territory, including Missoula sealcoating, Bozeman sealcoating, Fargo sealcoating, and Sioux Falls sealcoating.
Take the Next Step
Ready to protect your pavement investment? Our team is here to help with expert assessments and customized maintenance plans.
Request the Free RFP TemplateGet a Free Estimate
Have questions about what you just read? Drop your info and we'll follow up with a personalized assessment.
Related Articles
Sealcoat Now or Repave Later: A Budget Walk-Through for HOA Boards and Commercial Owners
Most boards I've sat across from aren't trying to skip maintenance. They're trying to figure out which line item to fund this year and which one can wait. Here's how that conversation actually goes when the numbers are on the table.
Property ManagementSealcoat Now or Repave Later: The Preservation ROI Matrix for HOA, Commercial & Municipal Owners
Every dollar of preventive sealcoating defers four to ten dollars of future repaving. Here's how that math actually pencils out for HOAs, commercial portfolios, and municipal road programs.
Asphalt PavingWhat Should Be Included in an Asphalt Paving Bid? A 17-Point Checklist
Most paving bids are impossible to compare because they hide the assumptions that decide the price. Here are the 17 line items that make a proposal decision-quality — and the exclusions that quietly move cost onto the owner.
Asphalt PavingWhen Is Asphalt Paving Season in Northwest Montana?
Paving season in Northwest Montana is set by surface temperature, mat thickness and the length of the working day — not by a date on the calendar. Here's how the window actually works, and how to plan around it.

