Back to BlogProperty Management

    How to Write a Pavement-Maintenance RFP: A Template for HOAs & Municipalities

    Summit Surface Partners9 min read
    How to Write a Pavement-Maintenance RFP: A Template for HOAs & Municipalities - Summit Surface Partners serving Montana, Idaho & Eastern Washington

    We've bid municipal and HOA pavement work in the Northern Rockies and Dakotas for 20+ years. The RFP often tells us how a project will go before work starts. A precise scope brings precise bids and good work. A loose one brings bids you can't compare and disputes later.

    If you're preparing work for a board or public-works director, use the structure and specification language below. It covers crack sealing, sealcoating, line striping, and full preservation programs.

    What a strong pavement RFP includes

    SectionWhy it mattersWhat to include
    1. Site inventoryBidders can't price what they can't measureSquare footage by surface, lane-miles, drawings or aerial map
    2. Current conditionForces apples-to-apples bidsPCI estimate, crack inventory, photos, oil-spot count
    3. Scope of workThe legal heart of the contractItemized tasks with units (LF, SF, EA)
    4. Material specificationStops the race to the bottomASTM standards, EPA 8310 PAH cap, product specifications
    5. Submittals requiredFilters serious biddersCOI, references, lab reports
    6. Evaluation criteriaTells bidders how to winPrice weight + technical weight + responsiveness
    7. Schedule & accessPrevents change-order fightsWorking hours, lot-closure windows, weather contingencies
    8. Warranty & documentationDefines "done"Warranty term, post-job submittals, before/after photos

    1. Site inventory

    Give bidders measured square footage for each surface type: drive lanes, parking stalls, ADA paths, and sidewalks. Attach an aerial PDF with the quantities marked if you can. On average, that gets you bids 20% tighter.

    2. Current condition

    Don't make bidders guess. State the PCI range (or have a free assessment done; we offer them across our service area), itemize the cracks > 1/8\", and call out oil spots that need primer. Call for Pricing.

    3. Scope of work: itemized, not narrative

    Bad scope: *"Contractor shall sealcoat the parking lot."*

    Good scope:

    - *Crack seal: 4,200 LF of cracks ≥ 1/8" with hot-applied rubberized sealant meeting ASTM D6690 Type II.*

    - *Oil-spot primer: 47 EA, each treated with a manufacturer-approved oil-spot primer prior to sealer application.*

    - *Sealcoat: 48,500 SF, two coats of asphalt-emulsion sealer applied at the manufacturer's published rate, with sand additive at 3 lbs/gal.*

    - *Line striping: re-stripe to existing layout, 4" white traffic paint, 92 stalls and 4 ADA stalls, ADA symbols and signage per ADA compliance guide.*

    4. Material specification: write it once, win every year

    Don't leave the material specification out of your HOA or municipal RFP. It's one of the most under-used sections. Here's the standard wording we recommend:

    > *Sealer shall be an asphalt-emulsion (non-coal-tar) pavement sealer meeting ASTM D-217 (cone penetration ≥ 340mm), D-2042 (10–35% asphalt residue), D-244 (15–20% water), D-3910 (wet track abrasion ≤ 35g loss), C-136 (#16 sieve 100% passing), and D-562 (≥ 75 KU viscosity). Total PAH shall be ≤ 1 ppm per EPA Method 8310, documented on a batch-specific lab report.*

    You can specify Pitch Black® against every clause above. Read the coal-tar bans post for why the PAH cap is now standard.

    5. Required submittals

    Get these documents with the bid. Don't wait until you've awarded the job:

    - Certificate of Insurance (general liability coverage meeting the bid requirements, auto, workers' comp).

    - Three references on similar-scope projects within the last 24 months.

    - Manufacturer data sheets and EPA 8310 lab report for the proposed sealer.

    - Sample warranty document.

    - Crew credentials and equipment list.

    If a bidder can't get you these documents in 5 business days, don't expect them to appear in 90.

    6. Evaluation criteria: publish the weights

    Publish your evaluation weights so bidders know how you'll decide. A typical defensible municipal split is 60% price / 30% technical (experience, materials, references) / 10% schedule & responsiveness. For an HOA, a simpler 70/30 can work. The weights improve technical bids and leave a paper trail if the award is challenged.

    7. Schedule and site access

    - Working hours (allow Sundays for retail).

    - Allowable lot-closure days and notification requirements (signage, email blasts).

    - Weather contingency language: application temperature requirements per the sealer manufacturer's spec.

    - Substantial-completion vs. final-completion definitions.

    8. Warranty and post-job documentation

    After the job, require the contractor to submit the following:

    - Time-stamped before/after photos of every area.

    - Application logs (gallons applied, temperatures, dates).

    - One-year workmanship warranty signed by the contractor.

    - Final invoice with quantities verified.

    You can use Summit's standard warranty page as a model.

    The 1-page template summary

    If you'd rather start from a 1-pager than draft this from scratch, email us at info@summit-surface.com and we'll send you the editable template we share with HOA boards and small-city public-works departments at no charge. It's not a sales document; it's the framework we wish every owner used, even on jobs we don't bid.

    When in doubt, do a free site walk first

    The cheapest 60 minutes you'll spend on the entire project is a pre-RFP site walk with someone who's actually paving in your region. We do them for free across MT, ID, WA, ND, and SD. Call (406) 309-SEAL or schedule a site walk.

    Frequently Asked Questions

    What should a good pavement-maintenance RFP include?

    Eight sections: site inventory, current condition, itemized scope of work, material specification (ASTM + EPA 8310 — see the coal-tar bans post), required submittals, evaluation criteria with published weights, schedule and access, and warranty plus post-job documentation. Pair the scope with the right services — crack sealing, parking-lot sealcoating, and line striping.

    How should bids be weighted on a municipal pavement RFP?

    A defensible municipal evaluation is typically 60% price, 30% technical (experience, materials, references), and 10% schedule and responsiveness. HOAs can simplify to 70/30. See How to Vet a Commercial Sealcoating Contractor for the technical-scoring checklist.

    What material spec language should I require for sealcoat?

    *Sealer shall be an asphalt-emulsion (non-coal-tar) pavement sealer meeting ASTM D-217, D-2042, D-244, D-3910, C-136, and D-562 with documented total PAH ≤ 1 ppm per EPA Method 8310 on a recent production batch.* Pitch Black® meets every clause — and the wholesale program ships the lab report with every order.

    What submittals should bidders provide at bid time?

    Bidders who can't produce these in 5 business days won't produce them in 90. Call for Pricing.

    Does Summit Surface Partners share its RFP template?

    Yes — email us at info@summit-surface.com and we'll send the editable 1-page template we share with HOA boards and small-city public-works departments at no charge. We bid across our five-state territory, including Missoula sealcoating, Bozeman sealcoating, Fargo sealcoating, and Sioux Falls sealcoating.

    Take the Next Step

    Ready to protect your pavement investment? Our team is here to help with expert assessments and customized maintenance plans.

    Request the Free RFP Template

    Get a Free Estimate

    Have questions about what you just read? Drop your info and we'll follow up with a personalized assessment.