The list of jurisdictions restricting or outright banning coal-tar pavement sealers has grown every year since Austin, Texas became the first to ban it in 2006. In 2026, the trend has moved beyond coastal cities into the kind of watersheds, school districts, and HOA covenants that directly affect property owners across the Northern Rockies and Dakotas.
If you own or manage pavement in MT, ID, eastern WA, ND, or SD, here's what's changed, why it's changing, and how to write a spec that won't get rejected at the next permit review.
Why coal-tar sealers are being restricted
Coal-tar emulsion sealers test in the thousands of parts per million of Polycyclic Aromatic Hydrocarbons (PAHs) under EPA Method 8310. Asphalt-emulsion sealers like our Pitch Black® test at 0.00 ppm total PAH on the same method (full PRI lab report on pages 4–5 of the Technical Bulletin).
USGS dust and sediment studies since 2005 have repeatedly linked coal-tar sealcoat dust to elevated PAH levels in stormwater, indoor dust adjacent to sealed lots, and downstream sediment. That's the science driving the bans.
2026 jurisdiction map — what applies in our service area
The table below summarizes restrictions Summit Surface Partners tracks for bid-and-spec work across our five-state territory. This is not legal advice — always confirm with the local jurisdiction before bidding.
| Jurisdiction | Status (2026) | Applies to |
|---|---|---|
| Washington State | Statewide retail sale ban (since 2012) | All commercial & residential applications |
| Spokane / Spokane Valley | State ban + municipal stormwater code | Public + private lots |
| Coeur d'Alene basin (ID) | EPA Superfund stormwater overlay | Lots draining to basin tributaries |
| Missoula County (MT) | Watershed protection guidance — coal-tar discouraged on bid lists | Municipal RFPs, schools |
| Bozeman & Gallatin Valley (MT) | HOA covenants increasingly prohibit coal tar | New residential developments |
| Fargo / Cass County (ND) | Red River watershed stormwater scrutiny | Commercial lots near outfalls |
| Sioux Falls (SD) | Big Sioux River watershed — PAH testing on new municipal bids | City contracts |
| Rapid City / Black Hills (SD) | School & USFS-adjacent projects spec asphalt-emulsion only | Public & federal-adjacent work |
What changes in 2026 specifically
Three things tightened this year:
- More HOAs are writing it into covenants. New-construction communities in Bozeman, Coeur d'Alene, and the Sioux Falls metro are adding coal-tar prohibitions to their CC&Rs at the developer-handover stage. Existing HOAs are amending at annual meetings.
- School districts are asking for PAH lab reports. Public-school RFPs in MT, ND, and SD are increasingly requiring an EPA Method 8310 batch report as a submittal — not just a manufacturer's statement.
- Insurance underwriters are noticing. A few national property carriers now ask about sealer chemistry as part of environmental-impairment underwriting on commercial portfolios.
What "compliant" actually means on a spec sheet
If you're writing or reviewing a spec, the clean language is:
> *Sealer shall be an asphalt-emulsion (non-coal-tar) pavement sealer meeting ASTM D-217, D-2042, D-244, D-3910, C-136, and D-562 with documented total PAH ≤ 1 ppm per EPA Method 8310 on a recent production batch.*
Pitch Black® meets every line of that spec — see the Technical Bulletin for the ASTM table and PRI lab report, and the FAQ post for plain-English explanations of each ASTM number.
Common myths we hear
"My driveway is residential, so it doesn't matter." It matters if the driveway drains to a storm inlet, a creek, or a watershed-protected area — and it matters if you're selling the property in a buyer-disclosure state.
"Asphalt-emulsion doesn't last as long as coal tar." Not true at the modern polymer-reinforced grade. Pitch Black is rated 3–5 years between recoats with proper prep — see Sealcoating vs. Repaving and How Often to Sealcoat.
"I'll just buy coal tar from out of state." Some jurisdictions (WA in particular) prohibit *application*, not just sale. Importing it doesn't make it legal to spray.
Action checklist for 2026
- Confirm whether your jurisdiction, watershed, school district, or HOA has coal-tar language on the books.
- Add the ASTM + EPA 8310 spec language above to your next RFP or contractor scope of work.
- Ask your sealer supplier for the batch-specific PAH lab report, not a generic data sheet.
- If you're a contractor in our region, stock a compliant sealer in advance — bids that require PAH documentation lose if you can't produce it the day of submittal.
Talk to a regional distributor
Summit Surface Partners is the regional Pitch Black® wholesale distributor for MT, ID, eastern WA, ND, and SD. Every order ships with the Technical Bulletin, the PRI EPA 8310 PAH report, and the SDS on file. Call (406) 309-SEAL or request wholesale pricing.
Frequently Asked Questions
Is coal-tar sealcoat banned in Montana, Idaho, or the Dakotas in 2026?
There is no statewide ban in MT, ID, ND, or SD as of 2026. Washington State has had a statewide retail-sale ban since 2012, and the Coeur d'Alene basin carries an EPA Superfund stormwater overlay. In our region, restrictions show up at the watershed, school district, HOA covenant, and municipal RFP level — which means the practical answer for most owners is yes, you should expect to spec asphalt-emulsion on new work.
What's the difference between coal-tar and asphalt-emulsion sealer?
Coal-tar emulsion sealers are refined from coal-tar pitch and routinely test in the thousands of ppm of PAHs. Asphalt-emulsion sealers like Pitch Black® are refined from petroleum asphalt and test at 0.00 ppm total PAH under EPA Method 8310. Performance-wise, modern polymer-reinforced asphalt-emulsion now matches or exceeds coal-tar service life. See the Pitch Black FAQ for the ASTM detail.
What spec language should I put in my RFP to stay compliant?
Use this clause: *Sealer shall be an asphalt-emulsion (non-coal-tar) pavement sealer meeting ASTM D-217, D-2042, D-244, D-3910, C-136, and D-562 with documented total PAH ≤ 1 ppm per EPA Method 8310 on a recent production batch.* See the pavement RFP guide for the full template and the wholesale page for compliant supply.
Do I need a batch-specific PAH lab report?
For most commercial and HOA work, the published PRI EPA 8310 report on pages 4–5 of the Pitch Black Technical Bulletin is sufficient. Public-school and municipal RFPs and watershed-permit projects increasingly require a batch-specific letter — Summit can request one from the manufacturer at no charge.
Will switching from coal-tar to asphalt-emulsion shorten my recoat cycle?
No. Polymer-reinforced asphalt-emulsion sealers like Pitch Black® are rated 3–5 years between recoats with proper parking lot sealcoating prep — the same window as coal tar. See How Often to Sealcoat for the full cycle guidance.
Take the Next Step
Ready to protect your pavement investment? Our team is here to help with expert assessments and customized maintenance plans.
Request a Compliant-Sealer Spec PacketGet a Free Estimate
Have questions about what you just read? Drop your info and we'll follow up with a personalized assessment.
Related Articles
Pitch Black® FAQ: ASTM Specs and the 0.00 ppm PAH Result, Explained
Cone penetration, wet track abrasion, EPA Method 8310, 0.00 ppm PAH — a short FAQ that translates the Pitch Black spec sheet into plain English.
Sealcoat WholesaleInside the Pitch Black® Spec Sheet: What the ASTM Numbers Actually Mean
Cone penetration of 340mm. Wet track abrasion ≤35g loss. 0.00 ppm PAH. The Pitch Black spec sheet is dense — here is what each line actually means for the lot you are about to seal.
Asphalt PavingWhat Should Be Included in an Asphalt Paving Bid? A 17-Point Checklist
Most paving bids are impossible to compare because they hide the assumptions that decide the price. Here are the 17 line items that make a proposal decision-quality — and the exclusions that quietly move cost onto the owner.
Asphalt PavingWhen Is Asphalt Paving Season in Northwest Montana?
Paving season in Northwest Montana is set by surface temperature, mat thickness and the length of the working day — not by a date on the calendar. Here's how the window actually works, and how to plan around it.

