When contractors buy Pitch Black® sealer from Summit, they usually want to know how it differs from the SealMaster or GemSeal drums they've used for ten years. Marketing copy won't answer that. Here, we explain the product specifications so you know what you're spraying.
The Specs That Matter (and Why)
Cone Penetration: ASTM D-217: 340mm minimum
Cone penetration tells you how thick the material is at 77°F; a lower number means a thicker body. Pitch Black's 340mm floor puts it on the firm end of the AEP (asphalt emulsion pavement) sealer range. On a hot southwest-facing lot in Missoula or Kalispell, that means the coating stays in the pores instead of slumping out. It also holds its film build under squeegee pressure.
Nonvolatile Components: ASMA A-1: 50% minimum
This tells you the solids content. Once the water flashes off, half the drum's weight remains on your pavement. Most commodity sealers don't meet that mark consistently across batches.
Nonvolatiles Soluble in Tri-Chloroethylene: ASTM D-2042: 10–35%
This measures how much of the solids is *actual asphalt*, the glue holding the film together. Too little makes the film brittle. Too much leaves it soft and prone to tracking. Pitch Black keeps that portion within a deliberately tight range.
Wet Track Abrasion: ASTM D-3910: ≤35 g loss
The test runs a wet abrasion head over cured film for 5 minutes, then weighs the material removed. The published limit is 35 grams. It's the same test used to qualify slurry seals for DOT use, which gives you a useful comparison. Most commodity driveway sealers don't undergo it.
Viscosity: ASTM D-562: 75 KU minimum
Krebs Units tell you how the material will spray, squeegee, and brush. At 75 KU, you can spray it through a standard tank-and-wand rig while staying within the published 15–25% water dilution.
Accelerated Weathering: Fed Spec TT-C-555B: No Deterioration
This is a federal masonry coating test. Pitch Black passes without visible deterioration. You don't see chalking, checking, or loss of the black film.
Resistance to Wind-Driven Rain: Fed Spec TT-C-551B: 98 mph
In the test, cured film blocks water driven by simulated 98-mph wind. For your lots in Montana, North Idaho, and the Dakotas, this matters most when November squalls hit pavement sealed in late September.
The Number Nobody Talks About: PAH Content
PRI Asphalt Technologies tested Pitch Black Batch 1071. They used EPA Method 8310 to test all 18 regulated Polycyclic Aromatic Hydrocarbons. The reported result was 0.00 ppm: none of the 18 PAH compounds were detected above the method detection limit.
Coal-tar sealers still legal in much of the country routinely test at thousands of ppm of PAHs. Washington State, Minneapolis, Austin, and dozens of watersheds ban them. Pitch Black is an *asphalt-emulsion* sealer, so you'd expect low PAH content. The third-party PRI report at 0.00 ppm gives you documentation for an HOA board, school district, or municipal RFP instead of a "probably fine" assurance.
Concentrate vs. Slurry: Which Grade Fits the Job?
We stock both grades at Summit. Which one you use comes down to the mix design in your tank:
- Concentrate (standard): 9.71 lbs/gal density, designed to be cut with 15–25% water and (for moderate-to-rough surfaces) 300–400 lbs of #40–60 silica sand per 100 gallons plus 1.5–3.5% Polytex® polymer additive.
- Slurry-grade: 10.0 lbs/gal density, pre-loaded with aggregate for squeegee and slurry-box application on weathered lots that need a heavier build coat.
Use concentrate when you're running a wand on a tight commercial lot. For slurry-sealing a 100,000 sq ft retail center that hasn't been sealed in eight years, confirm the mix for the job.
Surface Prep and Application: The Parts Crews Skip
These application conditions matter for the product to perform:
- Surface must be clean of dirt, sand, oil, and grease.
- Salt, deicing residue, fertilizer, and hard water deposits will cause bond failure. Wash and rinse.
- Cracks >1/8" must be filled with hot-applied rubberized crack sealant first and dry to the touch before sealcoat.
- Apply only when ambient air is ≥55°F and rising and surface temp ≥60°F.
- On hot days, fog-coat the surface to pre-dampen (not wet) before spraying.
- Always apply two coats. Heavy-traffic lanes get a third.
Skip pre-dampening on a 90°F lot, and you're following the crews that get warranty callbacks 14 months later.
Where Summit Fits In
We are a Pitch Black distributor for Montana, Idaho, Eastern Washington, North Dakota, and South Dakota. We stock concentrate and slurry-grade in 55-gallon drums and bulk totes, with will-call pickup at our Kalispell yard and delivery throughout the region. Contractors who buy through Summit get the published specs above, the PRI test report and a phone number that picks up when a batch question comes up at 6 a.m.
call us at (406) 309-SEAL when you are ready to spec your next pull.
Take the Next Step
Ready to protect your pavement investment? Our team is here to help with expert assessments and customized maintenance plans.
Talk to a Pitch Black DistributorGet a Free Estimate
Have questions about what you just read? Drop your info and we'll follow up with a personalized assessment.
Related Articles
Pitch Black® FAQ: ASTM Specs and the 0.00 ppm PAH Result, Explained
Cone penetration, wet track abrasion, EPA Method 8310, 0.00 ppm PAH. A short FAQ that translates the Pitch Black specifications into plain English.
Sealcoat WholesaleCoal-Tar Sealcoat Bans Are Spreading: What MT, ID & Dakota Owners Need to Know in 2026
A 2026 jurisdiction-by-jurisdiction look at coal-tar sealer restrictions affecting MT, ID, WA, ND, and SD owners: and how to lock in a compliant asphalt-emulsion spec before the next bid cycle.
Pavement PlanningSealcoat Cannot Fix a Broken Foundation: How to Choose Between Preservation, Repair, and Repaving
Sealcoating protects a suitable pavement surface, but it cannot rebuild failed pavement. Use this guide to separate preservation, defined repair, and repaving scopes.