Parking Lot Restriping Services: What to Plan and Buy

By Summit Surface Partners Team
Restriping a parking lot is more than repainting old lines. The layout, the accessible spaces, the fire lanes and the signs all have to meet current rules when the paint goes down, and the lot has to be ready for paint. Get the scope right once and the lot looks sharp, flows well and holds up in an inspection. We handle line striping and ADA layout alongside sealcoating, crack sealing and patching, so the pavement and the paint get planned as one job. You can see how that fits together on our parking lot striping and ADA page.
This guide is for property managers, HOA boards, facility managers and public-sector buyers in Montana, Idaho and Washington. It covers what restriping includes, when a lot needs it, what the law says, how to time it around our weather, and how to write a scope that gets clean bids.
TL;DR
-
Restriping covers stalls, aisles, arrows, stop bars, crosswalks, fire lanes and accessible spaces. Pavement prep and layout checks come first.
-
Under the ADA, when you restripe, you have to provide accessible spaces as the 2010 ADA Standards require. The count is figured per parking facility.
-
Some cities in Montana tie lot maintenance work, restriping included, to current code compliance, so check with your city or county before you change a layout.
-
Best results come from doing the pavement work first: crack sealing, patching, then sealcoat, then paint.
-
Ask for a written scope with bid alternates and a phasing plan so bids compare cleanly.
Table of Contents
What restriping services actually include
A good restriping job has several parts. The paint is the last one.
Assessment and layout. Someone walks the lot and compares what is painted to what should be. Old layouts drift. Stalls get shifted over the years, accessible spaces end up in the wrong spot, and fire lanes fade out. A layout plan fixes that before any paint is sprayed.
Surface prep. Dirt, loose debris and failed paint get cleaned off. Paint sticks to clean, sound pavement. It does not stick well to dust or crumbling asphalt.
Marking. Layout crews measure and mark the new lines, then stripe them. Typical markings include:
-
Standard stall lines, usually white
-
Drive lane lines, arrows, stop bars and crosswalks
-
Accessible stalls, access aisles and symbols
-
Fire lanes, usually red
-
No-parking zones and loading areas, usually yellow
-
Curb painting and wheel stops where the site calls for them
Signs. Accessible stalls need signs, and fire lanes often need them too. We also install signs, so the paint and the posts match the plan. See our parking lot sign installation service.
Cure and reopening. Lines need time to dry. On an occupied property, that means phasing the work so customers and tenants still have somewhere to park.

How to tell if your lot needs restriping, repair or resurfacing
These three problems look alike from the driver’s seat. They are not the same fix.
Restriping alone fits a lot with sound pavement and faded lines. If you can still see the surface is tight and smooth, paint is the answer. Other signs: stalls are hard to see at dusk, cars park crooked, or the layout no longer matches your site plan or tenant mix.
Repair first fits a lot with cracks, potholes and edge breakup. Paint over a cracked surface and the lines will break up with the pavement. Crack sealing and patching come before paint. Our crack sealing and parking lot repair crews work this way.
Resurfacing fits a lot where the surface is alligatored, rutted or ponding water in many spots. When you lay an overlay, the old lines are gone anyway, so the new layout gets painted fresh on the new surface. That is a good time to fix a layout that never worked. See parking lot resurfacing.
A simple walk-through test helps. Look at the lot in the morning and again at dusk. Note where lines have vanished, where cars cut across lanes, and where pavement is breaking. Photos by area give a contractor a head start.
Why the order matters: repair, seal, then stripe
The best sequence is patching and crack sealing, then sealcoat, then striping. Sealcoat protects the asphalt from sun, water and freeze-thaw. Striping goes on over it, and the lot comes out looking new.

If you skip the seal and only paint, you get fresh lines on a worn, faded surface. If you seal and do not paint, the lot looks black and blank and no one knows where to park. Doing both in one mobilization saves traffic disruption and keeps a single crew accountable for the finish.
We make our own Pitch Black® sealer, so sealcoat and striping can run together as one project. Our parking lot sealcoating and striping page lays out the combined job.
ADA rules that apply when you restripe
This is the part that surprises owners. Restriping triggers accessibility duties.
The U.S. Access Board’s compliance brief, hosted on ADA.gov, says that when a business or a state or local government restripes parking spaces, it must provide accessible spaces as the 2010 ADA Standards require. It treats the work as readily achievable in most cases, because restriping costs relatively little. It also says the required number of accessible spaces is calculated separately for each parking facility, and that one of every six accessible spaces, or fraction of six, and always at least one, must be van accessible.
Put plainly: if you have two lots, count each one on its own. If your lot has only a few accessible stalls, at least one is a van stall.
Location matters as much as count. The City of Spokane’s ADA design guide says accessible spaces belong on the shortest accessible route to an accessible entrance. Where a building has several entrances, they should be spread out. It also describes the accessible route as at least 3 feet wide, firm, stable and slip-resistant, with a slope no steeper than 1:12 in the direction of travel.

Stall width, aisle width, clearance, signage height and slope limits are all set in the standards. Our own references walk through each one: the ADA parking lot striping checklist and the ADA compliance requirements reference. Keep a copy with your site file.
For a legal question about your specific property, such as a complaint or a demand letter, talk to your attorney. For layout, markings and signs, we do the work to the standards. Our ADA parking striping service covers Montana, Idaho and Washington.
Local rules in the Northern Rockies
Cities add their own requirements on top of the federal ones. Check with your city or county planning office before you plan a layout change.
Montana cities can add their own parking and layout requirements on top of the federal ones, and some tie code review to work on existing lots. Missoula, for example, has a parking facilities ordinance. Not every town works the same way, so confirm with your city or county planning office before you plan a layout change.
If you move stalls, add a drive lane or change an entrance, ask first. A bid-ready scope should name the code items it follows so the reviewer can check them.
How often to restripe
There is no single calendar number. Lines wear with traffic, plowing, sanding, sun and freeze-thaw cycles. A busy retail entrance fades faster than a back row at an office park. Snow removal in winter scrapes the surface and sand abrades paint.
A practical way to schedule it:
-
High-traffic zones such as crosswalks, stop bars, arrows and accessible stalls get checked every season. These are the safety markings.
-
Standard stall lines are checked once a year, usually in spring after the plow season ends.
-
Full layouts get redone alongside sealcoating or resurfacing, so the paint lands on a fresh surface.
If a marking is hard to read, restripe it. Do not wait for the whole lot to fade. Faint accessible stalls and fire lanes are the first things that cause trouble in an inspection.
Our parking lot maintenance program can fold these checks into a yearly plan, so you are not reacting to complaints.
Timing around Montana weather
Striping paint needs dry pavement and mild temperatures. Check the paint maker’s label for the minimum surface and air temperature. In the Northern Rockies that points to a season roughly from late spring into early fall, with the best windows depending on the year.
Plan around three things:
-
Spring. Wait until snow is gone, the lot is swept and the surface is fully dry. Patching and crack sealing come first.
-
Summer. The main window. Sealcoat and striping run back to back.
-
Early fall. A final chance before the cold, but weather gets less reliable. Book early.
Winter work is limited to what the weather allows. Snow and ice management is a different job, and we offer commercial snow and ice service for sites that want one contractor year round.
Book your crew before the season opens. Spring and early summer fill up fast, and a lot that is scheduled early has the best shot at good conditions. We build season-aware plans so you are not scrambling in the first dry week.
Phasing: keeping the lot open
Most commercial lots cannot close. Retail centers, medical offices and apartment complexes need parking every day. Phasing solves that.

A phased plan splits the lot into zones. Crews stripe one zone while customers use the others. Cones, signs and temporary parking guidance keep traffic moving. For a bigger job, work may run at night or on a weekend to avoid peak hours.
When you ask for a bid, tell the contractor:
-
Business hours and peak times
-
Which entrances must stay open
-
Delivery and trash pickup schedules
-
Tenants with special access needs, such as a clinic or daycare
-
Any events that block a work window
Then ask for the phasing plan in writing. It should say what zone gets done when, how long paint needs to dry, and how people will be directed.
Writing a scope that gets clean bids
Public-sector buyers and HOA boards need bids that compare line for line. A vague request, like “restripe the lot,” brings back bids that cover different things. Then the lowest number is not the lowest cost.
A strong scope includes:
-
Site and lot count. If you have more than one parking facility, list each. This matters for the ADA count.
-
Existing conditions. Photos, a site plan if you have one, and notes on cracks or failed pavement.
-
Layout. Keep the existing layout or change it. If it changes, who approves it.
-
Marking list. Stalls, accessible stalls and aisles, arrows, stop bars, crosswalks, fire lanes, no-parking zones, curbs, symbols.
-
Signs. New, replaced or existing.
-
Pavement work first. Crack sealing, patching, sealcoating, as a base item or an alternate.
-
Standards. The ADA Standards, the MUTCD and any local code the lot falls under.
-
Phasing and hours. As above.
-
Weather terms. What happens if the window slips.
Bid alternates are optional line items priced separately. A common set: base bid for restriping only, alternate one adding crack sealing, alternate two adding sealcoat, alternate three adding sign work. The board or the agency can then choose what fits the budget without rebidding. We write our proposals with written scopes and bid alternates, and our municipal documentation is prepared to be bid-ready. That helps when your procurement office has formal rules.
Questions to ask before you hire
-
Will someone assess the lot in person and write the scope from what they see?
-
Does the scope name the ADA Standards and the MUTCD?
-
Does the plan show the accessible stall count for each lot?
-
Who handles the pavement prep, and does the same crew handle the striping?
-
How will the work be phased so the property stays open?
-
What is the weather plan?
A contractor who answers these clearly is one who plans the work. We start every job with a detailed assessment, so the scope matches the site.
Where we fit in
We are a Kalispell, Montana, paving and pavement preservation contractor. We work for commercial properties, HOAs, developers and public-sector buyers in the Flathead Valley, Montana, North Idaho and Eastern Washington. Striping and ADA layout are part of our service list, along with sealcoating, crack sealing, patching, resurfacing and paving.
If your lot needs paint only, we can do that. If it needs pavement work first, we plan the whole sequence under one scope. You can start with our commercial parking lot services or the line striping page. For broader paving and resurfacing, see asphalt paving.
Separately, for dry ice blasting, visit Summit Cryo at https://www.summit-cryo.com
Contractors who buy sealer wholesale can see our Pitch Black® pavement sealer supply.
Our view: stripe the lot as part of the pavement plan
Most lots we see are managed in pieces. One vendor patches, another seals, a third paints. The lines go down on pavement that was never prepped for them, and the layout gets copied from whatever was there before.
We think restriping works best when it is part of the pavement plan. Assess the lot. Fix what is broken. Preserve the surface with sealcoat we make ourselves. Then lay out the lines to current standards. One scope, one schedule, and a lot that is ready for inspection.
That is also how we like to work with public-sector buyers and HOA boards. Written scopes, bid alternates and phased work let you see the full picture and pick what fits your budget this year, and what waits for next season. Planning around our Northern Rockies weather beats chasing it.
The paint is the part customers notice. The prep and the layout are what make it last and pass review.
Ready to scope your lot
We assess the lot, write the scope with bid alternates, and plan the work around your season and your traffic. Our team handles striping and ADA layout with sealcoating, crack sealing and patching, so one contractor covers the whole sequence. Start at our parking lot sealcoating, crack sealing and striping page.

Call or email us for a free estimate.
FAQ
Does restriping a lot trigger ADA requirements?
Yes. The U.S. Access Board’s brief on ADA.gov says that when a business or a state or local government restripes parking spaces, it must provide accessible spaces as the 2010 ADA Standards require. The count is figured for each parking facility separately. We lay out accessible stalls, aisles and signs to the standards as part of our striping work.
Should I seal the lot before I restripe it?
In most cases, yes. Patch and seal cracks first, then sealcoat, then stripe. That way the paint goes on a clean, protected surface and the lot is disrupted once. We make our own sealcoat, so we can plan the two steps together.
When is the best time to restripe in Montana?
The main window runs from late spring into early fall, when pavement is dry and temperatures are mild. Spring and early summer book up quickly, so schedule early. Our season-aware planning is built around that window.
How do I get bids I can compare?
Write a scope that lists each lot, every marking type, signs, the standards to follow, phasing and weather terms. Ask for bid alternates on pavement work. That way every bidder prices the same job and you can choose what to include.
